I am on Integration Manager 10.x and also on Dynamics GP 10.x. I want to run an integration group from dynamics.
I can run a single integration with no problems; however, when i try to run an integration group .. the progres window never shows. I can tell that the entire integration group is running, however. When i run a single integration, the progress window shows just fine.
I have tried creating a new integration group, with only 1 integration as well as multiple integrations. I have also changed those integrations that I put into the group.
Can somebody offer me an answer?