•How does the cost get calculated when a SOP order it linked to a PO? Is it using the average cost? Can someone provide me with an example of how this works?
•When generating a PO how can they obtain the standard cost? They don’t want the vendors ‘ last originating cost. They are using average perpetual.
Thanks,